Fr. 76.00

Integrated Process Planning, Scheduling, and Due-Date Assignment

English · Paperback / Softback

Shipping usually within 3 to 5 weeks

Description

Read more










Traditionally, the three most important manufacturing functions are process planning, scheduling, and due-date assignment, which are handled sequentially and separately. This book integrates these manufacturing processes and functions to increase global performance along with manufacturing and production cost savings.


List of contents










1. Introduction to Integrated Process Planning, Scheduling, and Due-Date Assignment.  2. Process Planning.  3. Scheduling in Manufacturing.  4. Due-Date Assignment.  5. Integrated Process Planning and Scheduling.  6. Dynamic Integrated Process Planning and Scheduling.  7. Scheduling with Due-Date Assignment.  8. Scheduling with Due-Window Assignment.  9. Integrated Process Planning, Scheduling, and Due-Date Assignment.  10. Dynamic Integrated Process Planning, Scheduling, and Due-Date Assignment.  11. Solution Techniques in Integrated Manufacturing Functions.  12. Integrated Process Planning, Scheduling, Due-Date Assignment, and Delivery.

About the author










H.I. Demir completed his undergraduate education at Bilkent University, Industrial Engineering Department, with a full scholarship in Ankara, Türkiye. He completed his master's degree in Industrial Engineering at Lehigh University, Bethlehem, USA, with a full scholarship from the Ministry of National Education of Türkiye. He started his Ph.D. in Industrial Engineering at Northeastern University, Boston, USA, and completed his courses there. After returning to Türkiye, he finished his Ph.D. thesis on "Integrated Process Planning, Scheduling, and Due-date Assignment" at Sakarya University. He is still working as an Assistant Professor at Sakarya University. His research interests include optimization, simulation, scheduling, decision theory, multicriteria decision-making, and meta-heuristic algorithms.
A.H. Kökçam completed his master's degree at Sakarya University, Department of Industrial Engineering, in 2010 with a study on fuzzy project scheduling using meta-heuristic methods. He received his Ph.D. from Sakarya University, Department of Industrial Engineering, in 2017. In his doctoral dissertation, he worked on an alternative model to evaluate school success in the entrance examination for higher education. He works as an assistant professor at the Sakarya University Industrial Engineering Department. His research interests include meta-heuristic methods, artificial intelligence, fuzzy logic, optimization, and scheduling.
C. Erden is currently an assistant professor at the Sakarya University of Applied Sciences and a senior researcher at the AI Research and Application Center, Sakarya University of Applied Sciences, Sakarya, Türkiye. He worked as a research assistant in industrial engineering at Sakarya University and a researcher at Sakarya University AI Systems Application and Research between 2012-2020. He received his Ph.D. from Sakarya University in the field of industrial engineering. His research interests include scheduling, discrete event simulation, meta-heuristic algorithms, modeling and optimization, machine learning, and deep learning.


Summary

Traditionally, the three most important manufacturing functions are process planning, scheduling, and due-date assignment, which are handled sequentially and separately. This book integrates these manufacturing processes and functions to increase global performance along with manufacturing and production cost savings.

Customer reviews

No reviews have been written for this item yet. Write the first review and be helpful to other users when they decide on a purchase.

Write a review

Thumbs up or thumbs down? Write your own review.

For messages to CeDe.ch please use the contact form.

The input fields marked * are obligatory

By submitting this form you agree to our data privacy statement.