The Conditions of Contract prepared by FIDIC are used extensively as the standard contract of choice in international construction and civil engineering projects. Engineers working on these projects need to be aware of these contracts, but as the forms are complex it can be difficult to draw together all the sub-clauses relating to a particular issue.
The FIDIC Plant and Design-Build Forms of Contract Illustrated crystallizes the requirements of the FIDIC P&DB contract into a range of simple to follow flow charts, providing a clear and concise way to rapidly assimilate the requirements of each clause. The relationship between the various clauses in the contract, the concepts, process methods and actors involved in each sub-clause are all easily seen, and key issues around each topic (such as periods allowed, notices, etc) are all documented. In addition, related sub-clauses and/or important additional documents are linked so that the reader has a full understanding of the wider implications of each clause.
List of contents
Why is Reading This Book of Value? xiii
Acknowledgements xv
Concept?]flow Diagraming 1
Which is Which? Differentiating Among Obligations, Responsibilities and Rights 1
Summary Table 12
1 P&DB General Provisions 15
P&DB 1.2 Interpretation 15
P&DB 1.3 Communications 16
P&DB 1.4 Law and Language 18
P&DB 1.5 Priority of Documents 19
P&DB 1.6 Contract Agreement 21
P&DB 1.7 Assignment 22
P&DB 1.8 Care and Supply of Documents 23
P&DB 1.9 Errors in the Employer's Requirements 25
P&DB 1.10 Employer's Use of Contractor's Documents 27
P&DB 1.11 Contractor's Use of Employer's Documents 28
P&DB 1.12 Confidential Details 29
P&DB 1.13 Compliance with Laws 30
P&DB 1.14 Joint Several Liability 32
2 P&DB The Employer 33
P&DB 2.1 Right of Access to the Site 33
P&DB 2.2 Permits, Licences or Approvals 37
P&DB 2.3 Employer's Personnel 38
P&DB 2.4 Employer's Financial Arrangements 39
P&DB 2.5 Employer's Claims 40
3 P&DB The Engineer 43
P&DB 3.1 Engineer's Duties and Authority 43
P&DB 3.2 Delegation by the Engineer 46
P&DB 3.3 Instructions of the Engineer 48
P&DB 3.4 Replacement of the Engineer 49
P&DB 3.5 Determinations 50
4 P&DB The Contractor 51
P&DB 4.1 Contractor's General Obligations 51
P&DB 4.2 Performance Security 53
P&DB 4.3 Contractor's Representative 57
P&DB 4.4 Subcontractors 60
P&DB 4.5 Nominated Subcontractors 61
P&DB 4.6 Co?]Operation 62
P&DB 4.7 Setting Out 64
P&DB 4.8 Safety Procedures 67
P&DB 4.9 Quality Assurance 68
P&DB 4.10 Site Data 69
P&DB 4.11 Sufficiency of the Accepted Contract Amount 71
P&DB 4.12 Unforeseeable Physical Conditions 72
P&DB 4.13 Rights of Way and Facilities 75
P&DB 4.14 Avoidance of Interference 76
P&DB 4.15 Access Route 77
P&DB 4.16 Transport of Goods 79
P&DB 4.17 Contractor's Equipment 80
P&DB 4.18 Protection of the Environment 81
P&DB 4.19 Electricity, Water and Gas 82
P&DB 4.20 Employer's Equipment and Free?]Issue Material 83
P&DB 4.21 Progress Reports 86
P&DB 4.22 Security of the Site 89
P&DB 4.23 Contractor's Operations on Site 90
P&DB 4.24 Fossils 92
5 P&DB Design 94
P&DB 5.1 General Design Obligations 94
P&DB 5.2 Contractor's Documents 97
P&DB 5.3 Contractor's Undertaking 102
P&DB 5.4 Technical Standards and Regulations 103
P&DB 5.5 Training 106
P&DB 5.6 As?]Built Documents 107
P&DB 5.7 Operation and Maintenance Manuals 108
P&DB 5.8 Design Error 109
6 P&DB Staff and Labour 110
P&DB 6.1 Engagement of Staff and Labour 110
P&DB 6.2 Rates of Wages and Conditions of Labour 111
P&DB 6.3 Persons in the Service of Employer 112
P&DB 6.4 Labour Laws 113
P&DB 6.5 Working Hours 114
P&DB 6.6 Facilities for Staff and Labour 115
P&DB 6.7 Health and Safety 116
P&DB 6.8 Contractor's Superintendence 118
P&DB 6.9 Contractor's Personnel 119
P&DB 6.10 Records of Contractor's Personnel and Equipment 120
P&DB 6.11 Disorderly Conduct 121
7 P&DB Plant, Materials and Workmanship 122
P&DB 7.1 Manner of Execution 122
P&DB 7.2 Samples 123
P&DB 7.3 Inspection 124
P&DB 7.4 Testing 127
P&
About the author
Raveed Khanlari drafts, modifies and negotiates contracts on behalf of Farab Co., both from the view point of the contractor and employer, for projects that Farab is developing or maintaining.
Dr Mahdi Saadat Fard is Contract and Financing Manager, with Farab Co., with over 10 years of experience in power plant construction in Iran, Kenya, Sri Lanka, Iraq and Tajikistan, both from contractor and employer's side.
Summary
The Conditions of Contract prepared by FIDIC are used extensively as the standard contract of choice in international construction and civil engineering projects.